icon_CloudMgmt icon_DollarSign icon_Globe icon_ITAuto icon_ITOps icon_ITSMgmt icon_Mainframe icon_MyIT icon_Ribbon icon_Star icon_User icon_Users icon_VideoPlay icon_Workload icon_caution icon_close s-chevronLeft s-chevronRight s-chevronThinRight s-chevronThinRight s-chevronThinLeft s-chevronThinLeft s-trophy s-chevronDown

BMC Helix ITSM OnPrem to OnPrem Migration Service

Preparation: 10 Credits | Implementation: 167+ Credits

This offering is comprised of two separate Services; BMC Helix ITSM On-Prem to On-Prem Migration Preparation Service and BMC Helix ITSM On-Prem to On-Prem Implementation Service. Through collaboration with the Customer, BMC will prepare the Customer with a documented analysis, strategy and design deliverable to help carry out migration tasks utilizing BMC Helix Data Manager.

What you get:

BMC will perform the following:

As part of the Preparation Service, BMC will:

  • Identify and document Configurations and Integrations in a Proposed Project Schedule Document
  • Prepare Migration Design Document
  • Assist in the data analysis requirements related to HDM migration.
  • Conduct detailed planning sessions covering BMC’s recommended migration best practices using BMC’s Helix Data Manager. 
  • Provide a walk-through of the Helix Data Manager Project Schedule.
    • Walk through an example with Customer Project Manager to integrate the migration activities into the Customer’s master project plan, verifying plans are aligned and streamlined with the data migration activities.
  • Provide architecture requirements to support the HDM migration requirements.

Customer will be responsible for:

  • Providing an application subject matter expert (SME) with a good knowledge of Customer’s Advanced Configurations and integrations.
  • Customer is responsible for implementation steps defined in the Migration Design Document.

Project Milestones:

The following Milestones are established between the Customer and BMC. Once BMC has reached a milestone, the BMC project manager will issue a milestone completion letter to the Customer.

  • Milestone 1: Upon delivery and approval of the Migration Design Document along with Helix Data Manager Proposed Migration Project Schedule
  • Milestone 2: Upon completion of the Project Closeout meeting and the delivery of the project completion letter

As part of the Implementation Service, BMC will:

  • Conduct walkthrough of the migration process
  • Prepare Proposed Project Schedule
  • Install BMC Helix Data Manager in Customer’s environment
  • Run BMC Helix Data Manager discovery and data mapping
  • Prepare Deployment Plan within Migration Design Document 
  • Migrate Foundation Data*, Application Data*, reporting and transactional data. This may include data from IT service management (ITSM), Smart IT, and BMC Digital Workplace.
  • Migrate configurations and integrations - Max 10 standard integrations – integrations must be compliant to run on containerized environments
  • Prepare Construction Document
  • Repoint existing Integrations on the target system to the BMC Helix ITSM platform
  • Prepare Test Strategy/Plan Document
  • Perform Unit Testing
  • Assist Customer with System Testing and Integration Testing for up to three weeks
  • Execute final cut-over as documented in the Migration Design Document
  • Provide post-production assistance for up to one week.

Customer will be responsible for:

  • Completing Helix ITSM OnPrem to OnPrem Migration Preparation Service
  • Provisioning on-premises environment to install BMC Helix Data manager and host a copy of the required databases.
  • Configuring the staging database in Customer’s environment
  • Restoring copy of Customer’s production database on Customer’s staging database
  • Providing access to BMC consultants to their Remedy ITSM on-premises staging environment, including the new containerized ITSM platform.
  • Performing user functional testing for a period of up to three weeks before production go live
  • Providing an application subject matter expert (SME) with a good knowledge of Customer’s Advanced Configurations and integrations. (This SME will also be required to assist with unit testing.)
  • Providing a SME for any integrated applications to perform repointing of integrations and assisting with unit testing.
  • Remediating Non-Standard Advanced Configurations and Non-Standard Integrations
  • Applying fixes to Standard Configurations and Standard Integrations for non-migration related issues identified during user functional testing.

Project Milestones: The following Milestones are established between the Customer and BMC. Once BMC has reached a milestone, the BMC project manager will issue a milestone completion letter to the Customer.

  • Milestone 1: Upon delivery of the Project Schedule
  • Milestone 2: Upon delivery and approval of the Migration Construction Document
  • Milestone 3: Upon completion of the Project Closeout meeting and the delivery of the project completion letter

BMC will provide this Service with one of the approaches below:

Preparation Service

Standard Delivery*

  • N/A

Country-Specific Delivery*

  • 10 credits

ITSM_OPPS_003_ONSHORE

 

Implementation Service

Standard Delivery*

  • 167 credits

ITSM_OPMS_003_OFFSHORE

Country-Specific Delivery*

  • 271 credits

ITSM_OPMS_003_ONSHORE

Deliverables:

Using BMC’s standard methodology and templates, the following Deliverables are in scope for this project and will be delivered:

As part of the Preparation Service:

  • Proposed Project Schedule
  • Migration Design Document  

As part of the Implementation Service:

  • Proposed Project Schedule
  • Construction Document
  • Test Strategy/Plan document

Pre-requisites:

As part of the Preparation Service:

  • Customer’s project team must be staffed with experienced resources that are familiar with the Customer’s solution and business requirements.
  • Ensure that remote access is available and will be provided.

As part of the Implementation Service:

  • The ITSM Preparation migration service will have been executed prior to the execution of the Helix ITSM OnPrem to OnPrem Implementation Service offering.
  • Customer’s project team is staffed with experienced roles familiar with the Customer’s solution and business requirements.
  • Remote access is available and will be provided.
  • The Customer completed BMC’s recommended formal training before this project started.
  • Customer has met the architecture requirements of BMC Helix Data Manager including containerized ITSM platforms in scope for this offering.
  • The Customer’s On-prem BMC ITSM is version 7.6.04 or greater.
  • The Customer’s on-prem database is Microsoft SQL Server or Oracle.
  • Migration and testing will be performed on QA (Dev Staging) and Pre-Production environments.
  • BMC assumes that there are not any data integrity issues in Customer’s environment

Completion Criteria:

BMC will have completed the Service when the in-scope Service have been completed and the Deliverables have been reviewed in accordance with the Terms of Use and delivered to the customer Project Manager. Consultant days must be booked in no less than 8-hour increments/full days.

Additional information:

  • Estimated Duration:
    • Preparation Service: 1 Week
    • Implementation Service: 18 Weeks
  • In-scope Products:
    • BMC Helix Digital Workplace
    • BMC Helix ITSM
  • Service Type: Deployment
  • Availability: Active
  • Success Service Code:
    ITSM_OPPS_003_ONSHORE
    ITSM_OPMS_003_OFFSHORE
    ITSM_OPMS_003_ONSHORE
  • Date Last Updated: 07/25/2024
*Definitions

Getting started is easy

Service Highlights..