icon_CloudMgmt icon_DollarSign icon_Globe icon_ITAuto icon_ITOps icon_ITSMgmt icon_Mainframe icon_MyIT icon_Ribbon icon_Star icon_User icon_Users icon_VideoPlay icon_Workload icon_caution icon_close s-chevronLeft s-chevronRight s-chevronThinRight s-chevronThinRight s-chevronThinLeft s-chevronThinLeft s-trophy s-chevronDown

Control-M Workload Change Manager Deployment Service

29 CREDITS

This Service installs and configures the Control-M Workload Change Manager (WCM) solution for an existing Control-M environment. It also includes knowledge transfer of BMC’s recommended Control-M WCM best practices.

What you get:

BMC will perform the following in one environment:

  • Gather Customer’s current Control-M implementation information in the following areas:
    • Installation and configuration of the change management process
    • Procedural pains and challenges with the current approach for:
      • Outline manual efforts performed currently
      • Quality gate rules for each Control-M environment
      • Workflow approval process
      • Requirements for improving the workload change management procedures for:
        • Naming standards for the Control-M environments
        • Automation of manual tasks
  • Conduct a whiteboard session to review and recommend how Control-M WCM can be used to optimize the following parameters:
    • Site standards
    • E-mail configuration settings
    • User settings
    • General Control-M WCM administration level settings
    • Control-M WCM advanced settings
    • Promotion rules between two environments (if applicable)
  • Install and configure the Control-M WCM add-on in an existing Control-M for Distributed Systems environment
  • Prepare Construction Document
  • Prepare the Change Management Assessment (CMA) Report with recommendations from the whiteboard session
  • Conduct hand-off and knowledge transfer session with Customer

Customer will be responsible for:

  • Providing access to their internal domain expert resources, such as schedulers, application development, automation beneficiaries, file transfer beneficiaries
  • Providing the necessary technical resources for the installation and configuration, such as infrastructure and network administrators

Deliverables: Using BMC’s standard methodology and templates, the following Deliverables are in scope for this project and will be delivered:

  • Construction Document
  • Change Management Assessment (CMA) Report

Completion Criteria: BMC will have completed these Consulting Services when the in-scope Consulting Services have been completed, and the Deliverables have been delivered to the Customer Project Manager.

Pre-requisites:

Additional information:

  • Estimated Duration: 24 days
  • In-scope Product: Control-M
  • Service Type: Deployment
  • Availability: Active
  • Success Service Code: CTLM_WCMS_001
  • Date Last Updated: 07/06/2022

Getting started is easy

Service Highlights..