|
Do you have a Failover and/or Disaster Recovery plan in place for your Batch Scheduling with BMC Control-M?
| On Demand |
| Recorded: |
01 AUG 2007 1:00 PM CDT
|
| Presenter: |
Terry Cannon |
| Language: |
English |
| Registration: |
Register Now |
Please join us for this 1 hour webinar covering a wide range of BMC Control-M related topics related to Failover and DR. We will discuss several different approaches to Failover, their advantages, and how long it takes to failover in each scenario.
Scenarios to include:
- Rebuilding system if needed (no secondary installs in place)
- Installing cold system to be activated as needed
- Installing warmer systems
- Installing hot systems (clusters, OS failover software)
|