Rate this page   Save this item Print this page Email this page

Do you have a Failover and/or Disaster Recovery plan in place for your Batch Scheduling with BMC Control-M?

On Demand
Recorded: 01 AUG 2007 1:00 PM CDT
Presenter: Terry Cannon
Language: English
Registration: Register Now

Please join us for this 1 hour webinar covering a wide range of BMC Control-M related topics related to Failover and DR. We will discuss several different approaches to Failover, their advantages, and how long it takes to failover in each scenario.

Scenarios to include:

  • Rebuilding system if needed (no secondary installs in place)
  • Installing cold system to be activated as needed
  • Installing warmer systems
  • Installing hot systems (clusters, OS failover software)

 

 

Business runs on IT. IT runs on BMC Software.